Construction Equipment Inventory
# | Equipment Name | Quantity | Remarks |
---|---|---|---|
1 | RMC Plant 30 CP | 5 | - |
2 | Concrete Pump | 5 | - |
3 | Transit Mixer | 4 | โ |
4 | JCB Machine | 4 | - |
5 | Concrete Mixtures | 15 | - |
6 | Vibrators | 40 | - |
7 | Shuttering | 25,000 SQM | - |
8 | Surface Vibrator | 5 | - |
9 | Cube Testing Machine | 5 | - |
10 | Generator Set (10 to 125 kg) | 10 | - |
11 | Curing Pumps | 40 | - |
12 | Tullu Pump | 35 | - |
13 | Welding Sets | 20 | - |
14 | Compactor | 6 | - |
15 | Drilling Machine | 6 | - |
16 | Auto Level | 7 | - |
17 | Theodolite | 2 | - |
18 | Concrete Cube Moulds | 30 SET | - |
19 | Tractor Trolly | 3 | - |
20 | Gamzen Batching Plant | 2 | - |
21 | Venus Feori | 4 | - |
22 | Tower crane | 1 | Model TC5540 |
Note
All the aforementioned equipment, tools, plants, and machineryโincluding RMC Plants, Concrete Pumps, Transit Mixers, JCB Machines, Concrete Mixtures, Vibrators, Shuttering Materials, Cube Testing Machines, Generator Sets, Curing Pumps, Welding Sets, Compactors, Drilling Machines, Auto Levels, Theodolites, Cube Moulds, Tractor Trolleys, Gamzen Batching Plants, and Venus Feori unitsโare in excellent working condition and maintained regularly.
Adequate deployment of the above-listed resources shall be ensured at the project site, strictly in accordance with the requirements and directions of the Client, Architect, or Supervising Agency.
In case of any special or additional machinery requirement beyond the listed inventory, the same shall be arranged promptly and to the complete satisfaction of the supervising authorities.
Adequate deployment of the above-listed resources shall be ensured at the project site, strictly in accordance with the requirements and directions of the Client, Architect, or Supervising Agency.
In case of any special or additional machinery requirement beyond the listed inventory, the same shall be arranged promptly and to the complete satisfaction of the supervising authorities.